These are studies for Hurleypalmerflatt team on existing Data Halls. After surveying the halls, a CFD model is developed to produce a report of the halls heat balance in the event of cooling units (CRAC units) failure. Improvement measures were recommended for hall’s safe operation.

  • Chevron Data Hall  84m² data hall with 1280W/m² equipment load
  •  Indigo Data Hall 84m² data hall with 1280W/m² equipment load
  • Seafield Data Hall 79m² data hall with 270W/m²
  • Nationwide NCD Data hall 2300m² data hall with 1300W/m² equipment load

Indigo Data Hall

Data-center Critical Cooling CFD Ecodynamis

Indigo Data Hall

Colour Coding for Pressure in the floor void

Indigo Data Hall Critical Cooling CFD Ecodynamis

Computation Fluid Dynamic Model

Streamlines in the floor void

Indigo Data Hall Critical Cooling CFD Ecodynamis

Computation Fluid Dynamic Model

Chevron Data Hall

 

Streamlines of air from CRAC units

Chevron Data Hall Critical Cooling CFD Ecodynamis

Computation Fluid Dynamic Model

Seafield Data Hall

 

Colour Coding for Temperature at normal operation

Seafield-Data Hall Critical Cooling CFD Ecodynamis

Computation Fluid Dynamic Model

Colour Coding for Temperature at CRAC failure operation

Seafield-Data Hall Critical Cooling CFD Ecodynamis

Computation Fluid Dynamic Model

Nationwide NCD Data Hall

 

 

Colour Coding for Air Temperature heat islands

Nationwidw NCD Data Hall Critical Cooling CFD Ecodynamis

Computation Fluid Dynamic Model

 